ServicesPanel Upgrades
Panel Upgrades in White Settlement
Your electrical panel decides how much your home can run at once. We look at what you have and explain what each upgrade option means in plain words. Then we do the work to code, with the permit and inspection handled.

What a Panel Upgrade Actually Means
People use "panel upgrade" for a few different jobs. Sometimes it means swapping a worn or recalled panel for a new one of the same size. Sometimes it means raising your service, for example from 100 amps to 200, so your home can carry more load. And sometimes the panel is fine and you just need a few more breaker spaces. Those are very different jobs, so we start by finding out which one fits your home.
Our work is done under a Master Electrical License, and after 5 years in business we've learned that most people just want a straight answer. If a smaller fix will do, we tell you. If the panel is unsafe or truly too small for how you live, we show you why before you decide anything.
What's Included in the Work
A load check before any quote
We add up what your home draws now and what you plan to add, like a heat pump, an EV charger or a hot tub. That number tells us whether you need more amps or just a cleaner setup.
New panel and breakers
We remove the old panel, mount the new one and move each circuit over, labeled so you can find the kitchen or the dryer without guessing.
Grounding and bonding brought up to code
Old panels often have weak grounding. We check the ground rods and bonding and correct them so the new panel protects your home the way it should.
Permit, inspection and utility coordination
We pull the permit required by your local jurisdiction, schedule the inspection, and coordinate with the utility when the service has to be disconnected and reconnected.
Room to grow
We size the panel with spare spaces, so adding a circuit later for a shop, a generator or a battery doesn't mean another panel change.
Signs Your Panel May Need Attention
Breakers that trip during summer
If breakers trip when the AC and dryer run together on a hot afternoon, your panel or service may be undersized for today's load. It can also be a single bad circuit, which our Electrical Repair visit can sort out.
Warm panel cover or a burning smell
A panel should never feel hot or smell like melted plastic. That points to loose connections or failing breakers and is worth having looked at soon.
No open breaker spaces
Tandem breakers squeezed in everywhere, or new circuits you can't add, mean you've outgrown the panel.
An older brand with a known history
Some older panel brands have a record of breakers that don't trip when they should. If you're not sure what you have, a photo of the label is a good start.
Flickering lights when big appliances start
Lights that dim every time the AC kicks on can mean a strained service or a loose main connection.
How the Job Day Goes
- 1
Service visit and written options
We open the panel, test it, check the load and walk you through what we found. You get your options in writing, with what each one solves.
- 2
Permit and scheduling
Once you choose, we pull the permit and set a date. If the utility needs to cut power at the meter, we arrange that too.
- 3
The swap
Power is off for most of the day, usually several hours. We tell you ahead of time so you can plan around the fridge, medical devices or working from home. We protect the area around the panel and clean up when we're done.
- 4
Inspection and walkthrough
The inspector checks the work, the utility restores power if needed, and we show you the new labeled panel and how to reset a breaker.
What Moves the Cost of a Panel Upgrade
There's no single price because there's no single job. A same-size panel swap and a full service increase are priced very differently. After the service visit we explain exactly what's driving your number, so nothing shows up later as a surprise.
- Panel swap or service increase
- Raising your amperage often means a new meter base and service wires, which adds parts and utility coordination.
- Where the panel sits
- An outside panel on an open wall is simpler than one tucked in a closet or garage with finished walls around it.
- Condition of the existing wiring
- Brittle wire, aluminum branch circuits or missing grounds need attention before they go into a new panel.
- Grounding and code updates
- Bringing grounding, bonding or required breaker protection up to current code can add time and materials.
- Permit and inspection requirements
- Fees and inspection steps vary by jurisdiction, and we include them in your written options.
Panel Upgrade Questions
Something not covered here? (682) 474-0799
How long does a panel change take?
Most panel swaps take most of one day, with the power off for several hours. A service increase can take longer because the utility may need to disconnect and reconnect at the meter. We give you a realistic window before the job date.
Do I need 200 amps?
Not always. Many homes run fine on less, especially if you're not adding big loads. If you're planning an EV charger, a larger AC system or a workshop, 200 amps often makes sense. The load check tells us, and we explain the numbers instead of just recommending the biggest option.
Do you pull the permit?
Yes. We pull the permit required by your local jurisdiction and schedule the inspection. You don't have to deal with the paperwork, and the inspection gives you an independent check of the work.
Can my panel be repaired instead of replaced?
Sometimes. A single bad breaker or a loose lug can often be fixed without a new panel. If the panel has a poor safety history, is damaged or simply has no room left, replacement is the better choice, and we'll tell you why.
Will a new panel help if I add an EV charger or generator later?
That's one of the best reasons to plan ahead. We can size the panel and leave spaces for EV Charger Installation or Generator Installation down the road, so the later job is simpler.
Not Sure What Your Panel Needs?
Book a service visit and we'll test your panel, check your load and lay out the options in plain English. You decide what happens next.